EvoconHelp Center

Operators · 1/7

Understand the screen

Header, timeline, colors and indicators in Shift View.

Start →
  1. 1Short guide for operatorsQuick reference for operators: the main Shift View tasks (operators, stop reasons, changeovers, scrap, speed loss, messages) and the elements of the header, timeline and footer.
  2. 2Shift ViewIndex of all Shift View guides, grouped by general topics, navigation, header, timeline, footer and managing of shifts.
  3. 3Shift View overviewDescription of every element of the Shift View: the header (station, shift, batches, Speed/OEE graphs, shift OEE) and the hour lines with their colors, signals and pins.
  4. 4Shift View colorsWhat each color, circle and icon on the Shift View timeline and batch display means: green, yellow, red, dark red, grey, blue pins, orange circles and the blue flag.
  5. 5Shift View display modesThe 6 Shift View display modes, from mobile to 4K screens, with the screen widths at which each is used and what changes in each.
  6. 6Live/offline indicatorWhat the green Live dot and the red Offline indicator in the Shift View header mean, and how the device offline notification behaves.
  7. 7OEE widgetHow to open the OEE graph in Shift View and what its lines and bars (availability, performance, quality, target OEE, hourly OEE) mean.
  8. 8Speed widgetHow the Shift View speed graph works: unit formats, choosing a format, zooming and dragging, and what the lines and colored areas mean.
  9. 9Produced quantity colorsHow the hourly target quantity in Shift View is calculated and why the produced quantity is shown in green, yellow or red.
  10. 10Stacked pinsHow Shift View stacks pins that are close together into one numbered pin, and how to open it to see each event.
  11. 11Current shift timerHow the automatic timer returns Shift View users to the latest shift or notifies them when a new shift starts, and how to go back to the last shift.
  12. 12Estimated production time in Shift ViewHow Shift View estimates the time left to finish the current batch or order, and how to set the target quantity the estimate needs.
  13. 13View settings and Alternative unit in Shift ViewHow to open the Shift View view settings and personalize Mr Evocon, shown quantities, unit, footer changeover button and checklist pins.
Next topicStart your shift →

Click the image for actual size